Back in 2003 a master development plan has been elaborated for the new Bernburg plant of Coil. The master development plan considered two continuous anodizing lines of which the first one has been built and commissioned in 2004. Today, Line 6 and a new logistics bay are also build-up. The existing office building had some modifications to integrate this growing. The next step is to automatize the transport of the Coils from the old line to the new logistic bay to let the entire production hall free of forklift. This will enable a fully automated handling of the Coils in the production hall for both lines. |