NTM Profilarbed (Luxembourg)

Client Profilarbed Profilarbed
Industry Steel
Start 09 / 2001
End 09 / 2004
Budget conf.
     
Project Scope

Project definition and layout coordination
Project coordination
Time schedules (contractual and detailed)
Site assistance
Financial tracking
Project administration
Photo documentation
Overall CE documentation
Basic engineering
Detail engineering
Safety coordination
Project management
Site management
Permitting
Contracting
IPS Scope

Project definition and layout coordination
Project coordination
Time schedules (contractual and detailed)
Site assistance
Financial tracking
Project administration
Photo documentation
Overall CE documentation
Description

Construction of a Medium section mill for the production of beams, angles and U-shapes
Capacity of the mill: 800 000 t/y
New bays (75 000 m?)
Walking Beam Furnace, Rolling Mill with auxiliaries, Maintenance shops, Iced water station, Electrical supply Transfo 65/10kV, overhead cranes (10,5 t – 32 t), Social building (1713 m?)
Project duration: 24 months

Product description:

The new mill is the next step in an integrated production process, coming behind the electrical arc furnace and the continuous caster. Semi-finished products coming out the continuous caster are rolled after reheating in a furnace. The rolling part of the line consists of 3 mill stands (Break-down, Tandem and Finishing mills) producing beams, angles and U-shapes. After cooling, the product will enter the finishing area to be straightened, cut to customer-specified lengths and to be dispatched by train or truck directly to the customer.