Description
HECKETT-MULTISERV, specialized in services
to the metallurgic industry, received an order
from DUFERCO LA LOUVIERE for the construction
and exploitation of a coil yard for hot rolled
coils. The project is named « COIL MANAGEMENT
DUFERCO LA LOUVIERE ».The Civil Works (hall
construction included) will be realised by DUFERCO.
All of the equipment for coil manipulation,
logistics and informatics are done by HECKETT-MULTISERV.
HECKETT-MULTISERV participates in the general
management of the project, which also includes
the works done by DUFERCO. The construction
of the coil yard is to be carried out without
interrupting the production of the hot mill.
Product description:
The coil yard consists of a covered section
(222m x 30m approx.) and an outside section.
Equipment for coil transport between the halls
of the hot roll rolling mill and the yard (walking
beam) is installed by DUFERCO. At the end of
the hall, a workshop is located for rectification
of damaged coils.
|