Group-IPS

 
  You are here:    Home > Projects > Ceres >

Ceres - Brussels (Belgium)

Client CERES Groupe Soufflet Ceres
Industry Food
Start 10 / 2003
End 12 / 2004
Budget 1.9 Mio euro
     
Project Scope

Construction of a new bulk storage warehouse, including flour loading system for bulk transporters.
IPS Scope

Project definition and dimensioning based on analysis of production bottlenecks, evaluation of current output and future market expectations
Basic layout
Budget
Environmental and building permit
Basic engineering : civil works, steel structure, filling and loading equipment, automation concept for weight measurement control
Procurement and contracting
Time schedule
Project administration
Safety coordination
Site management
CE-certification
Description

In order to increase performance and flexibility, to guarantee compliance with ATEX regulations and ensure a fixed range of high quality products to industrial customers as well as traditional bakeries, the CERES main production site in Brussels expands its bulk storage and loading capacity. The new storage silos and loading facility use latest technology for mechanical and pneumatic transport in order to increase performance and comply with sanitary regulations and security directives. The new technological equipment consists of:

28 steel silos of different capacity
Supporting steel structure resting on 4 vertical beams, anchored on pile foundations
Pneumatic and vibratory extractors, pneumatic and mechanical transport
Centralized and individual aspiration and filtration- Weighbridge
PCS7 based SCADA. At the same time, the loading equipment of the existing bulk stand is being revamped electrically and mechanically.

Product description:

CERES is the first miller in Belgium with a large variety of flour products, available in bag or bulk. The bulk warehouse increases storage capacity and loading flexibility for different flour products and mixtures. The new bulk warehouse and technological equipment have following characteristics:

Storage capacity: 670 tons
Extracting speed: mechanically up to 60T/h, pneumatically up to 250 T/h.

Ceres

 


About Group-IPS | Services | Projects | Methods | News | Staff & Jobs | Contact us

Group-IPS - All rights reserved.

web design © Group-IPS.