Carinox - Charleroi (Belgium)

Client UGINE & ALZ Group Arcelor Carinox Carinox
Industry Steel
Start 06 / 2002
End 10 / 2005
Budget 235 Mio euro
     
Project Scope

Construction of a stainless steel plant 1 Mio tonnes /year
Including:

Electric arc furnace, AOD converter
Ladle treatment system
Continuous slab caster
Dust treatment plant
4 Slab grinding mills
Water treatment plant
Approx. 10.000 T steel structures
Approx. 35.000 m3 concrete
HT supply distribution 150 kV/30 kV
O2, N2, Ar gas pipeline (outsourced)
Scrap and slag yard (outsourced)
Road & rail network (approx.33.000 m2)
New site entrance
IPS Scope

Overall, contractual and detailed time scheduling (tracking & coordination)
Cost control
Site safety coordination
Supervision of civil works (engineering and site works)
Project quality plan
Preparation of various calls for bids
Site Management

Description

Construction of a completely new plant for the production of stainless steel slabs from scrap and additions (ferro-alloys, metals,…). The project includes the civil works, steel structures, equipment & automation, auxiliary plants as well as the infrastructure required (road and rail network, new site entrance,…). IPS was involved during the project preparation phase and continues the mission during engineering and realisation phase.

Some project characteristics:

35.000 m3 structural concrete
10.000 t of structural steel
37.000 m2 road network
5 km HT cable drawn to the site
14 km of pipeline
Installed power capacity excl. furnace : 25MVA
Removed heat capacity : avg 100 MW, peak 200 MW

Product description:

Output:

Stainless steel slabs 30 t, 1 Mio tons/year
65 % ferritic, 35% austenitic
Thickness 200 mm, width: 1000 – 1650 mm, length 5500 – 12000 mm

 